“We need it built and running in 8 weeks”
System Aqua recently completed a fast-track LSS installation for a 160m3 marine mammal pool at the Combe Martin Wildlife Park in Devon.
System Aqua recently completed a fast-track LSS installation for a 160m3 marine mammal pool at the Combe Martin Wildlife Park in Devon.
Last week, we had the privilege of installing one of our UV steriliser systems for our friends at Blackpool SeaLife!
Nice little installation completed this week for our friends at SeaLife London Aquarium.
Design, Fabrication and installation of a new filtration system to connect together 5 exhibits onto a new tropical marine system.
Fabrication and installation of filtration to polish the seawater deliveries. Consisting of custom-built protein skimmer and degas tower along with Ozone dosing panel…
Installation of new filtration on the penguin pool, consisting of 2 filtration pumps and 1 circulation pump. Mechanical filtration is achieved with 2 900mm sand filters…
We completed a major service of the crocodile system at Chester Zoo. This included the repair and servicing of multiple pumps, UV’s, sand filters and more.
We installed 4 small quarantine systems. The systems were designed by our customer and we worked with them to install them to meet their needs.
We are responsible for the annual maintenance of the pumps at Bear Grylls Aquarium. On this job we rebuilt x5 large pumps. This included the installation…
We designed, fabricated, and installed a new 18,000 litre shark holding tank and life support system. The tank was built from polypropylene which was machined in…
As part of our LSS servicing program at Chessington Zoo, we’re responsible for the maintenance and repair of a large range of equipment. For this job,…
We installed a new temperature control system for a large quarantine area at London SeaLife Aquarium. This included the installation of 2 large chillers, 11 plate…
We were asked to resolve an ongoing issue with the failure of 2 4kw pumps. We found the motors on both pumps had failed and on…
We installed the life support systems for the new exhibits at Sea Life Adventure.
We installed a new 60kw chiller, pipework, buffer tank and heat exchanger to control the temperature of a large ray pool exhibit.
We installed the life support systems for the new exhibits at Sea Life Adventure.
We renewed the existing chiller system at SeaLife Adventure. We rebuilt the existing heat exchanger, installed all new ABS pipework, actuator and temperature sensors. We also…
The fabrication and installation of life support systems on multiple quarantine tanks. The installation of 11 plate heat exchangers, hundreds of meters of copper pipework and…
We were brought in to service the LSS for their large diving display. This involved stripping back pumps and changing mechanical seals, O-rings, impellers and various…
We installed a small life support system on 30m3 display. This included a small sand filter, biological reactor, carbon filter, in-line heater and pumps. This system…
Working together with our trusted suppliers, we installed two hydrogen sulphide monitoring systems on a set of denitrifying filters. The units are used to monitor levels…
We completed all the plumbing of one of the UK’s largest rock pool exhibits. This involved the installation of hundreds of meters of PVCu pipework. The…
We complete monthly LSS service visits where we maintain various plant rooms for the Sea Life Centre and Sea Lions Systems. Our service visits include maintaining…
We fabricated a 6000 x 1500 x 1500mm PP salt water mixing tank with mixing pump, heater and top up pump along with all the plumbing…
We completed the installation of all the LSS, plumbing and coral holding tanks for the UK’s longest coral exhibit. The system included 16 tank inlets with…